Route Details:

Operator: Eurostar International Ltd
Train Type: Unspecified Train
Route Length: 1235 km
Travel Time: 339 min
Average Speed: 219 km/h
Maximum Speed: 230 km/h

Speed Profile:

Please note: Only the maximum speed of the rails are used for speed calculations. Because of signalling, individual maxspeed for different rolling stocks, tilting technology and economic reasons the actually driven speed can be different. Time needed for boarding is also not evaluated.

Railway Details:

Railway Operators: SNCF Réseau (86.8 %), HS1 Ltd (7.2 %), Groupe Eurotunnel (4.1 %), Eurotunnel (0.1 %), Network Rail (0 %), N/A (1.8 %)
Railway Users: passenger traffic (64.2 %), mixed traffic (3.2 %), N/A (32.6 %)
Electrification: 25000 V / 50 Hz AC (96.9 %), 1500 V / DC (3 %), 25000 V / 750 Hz AC (0.1 %)
Structures: 105.1 km in tunnels (8.5 %), 53 km on bridges (4.3 %), 20.7 km on embankments (1.7 %), 7.1 km in cuttings (0.6 %), 1049.2 km on ground level (85 %)
Gaps in Route: 0

Map of Route and Stops:

Train Details:

Train Image
Train Name: ÖBB Railjet
Train Type: Highspeed Train
Maximum Speed: 230 km/h
Weight empty: 419 t
Power: 6400 kW
Maximum Torque: 300 Nm
Maximum Brake Acceleration: 0.7 m/s²
Length: 205 m
Seats: 408