Railway Operators: PKP PLK (16.6 %), DB Netz AG (15.2 %), PKP (3.2 %), N/A (65.1 %)
Railway Users: passenger traffic (2.6 %), N/A (97.4 %)
Electrification: 3000 V / DC (85.1 %), 15000 V / 16.7 Hz AC (14.9 %), 0 V / N/A (0 %)
Structures: 0.7 km in tunnels (0.1 %), 7.5 km on bridges (1.3 %), 5.7 km on embankments (1 %), 2.3 km in cuttings (0.4 %), 578.7 km on ground level (97.3 %)
Gaps in Route:
0