Railway Operators: SŽDC (62.2 %), ÖBB-Infrastruktur AG (20.9 %), SŽ (12.4 %), Správa železnic, s. o. (4.5 %)
Railway Users: mixed traffic (99.9 %), N/A (0.1 %)
Electrification: 3000 V / DC (44.9 %), 25000 V / 50 Hz AC (34.2 %), 15000 V / 16.7 Hz AC (20.9 %)
Structures: 3.6 km in tunnels (0.9 %), 11.8 km on bridges (2.9 %), 21.8 km on embankments (5.4 %), 365.3 km on ground level (90.8 %)
Gaps in Route:
0