Railway Operators: Network Rail (42.5 %), London Overground (4.4 %), N/A (53.1 %)
Railway Users: mixed traffic (12 %), freight traffic (0.3 %), N/A (87.7 %)
Electrification: 25000 V / 50 Hz AC (78.2 %), 750 V / DC (20.9 %), 25000 V / 750 Hz AC (0.9 %)
Structures: 1.8 km in tunnels (6.3 %), 3.6 km on bridges (12.9 %), 5.3 km on embankments (18.8 %), 3.1 km in cuttings (11 %), 14.3 km on ground level (51 %)
Gaps in Route:
0