Warning: Division by zero in /users/osmtrainroutes/www/functions/getData.php on line 2239
Train Analysis: GR HC London King's Cross → Inverness

Route Details:

Operator: London North Eastern Railway
Train Type: Unspecified Train
Route Length: 932.5 km
Travel Time: 344 min
Average Speed: 163 km/h
Maximum Speed: 201 km/h

Speed Profile:

Please note: Only the maximum speed of the rails are used for speed calculations. Because of signalling, individual maxspeed for different rolling stocks, tilting technology and economic reasons the actually driven speed can be different. Time needed for boarding is also not evaluated.

Railway Details:

Railway Operators: Network Rail (20.8 %), N/A (79.2 %)
Railway Users: mixed traffic (20.4 %), passenger traffic (0.4 %), N/A (79.2 %)
Electrification: 25000 V / 50 Hz AC (74.8 %), not electrified (25.2 %)
Structures: 12.5 km in tunnels (1.3 %), 21.2 km on bridges (2.3 %), 17.4 km on embankments (1.9 %), 6.4 km in cuttings (0.7 %), 875 km on ground level (93.8 %)
Gaps in Route: 0

Map of Route and Stops:

Train Details:

Train Image
Train Name: DB ICE T 7-teilig
Train Type: Highspeed Train
Maximum Speed: 230 km/h
Weight empty: 368 t
Power: 4000 kW
Maximum Torque: 200 Nm
Maximum Brake Acceleration: 0.7 m/s²
Length: 184.4 m
Seats: 390