Railway Operators: DB Netz AG (81.7 %), SŽDC (2 %), N/A (16.2 %)
Railway Users: mixed traffic (50.4 %), passenger traffic (3.4 %), N/A (46.2 %)
Electrification: 15000 V / 16.7 Hz AC (97.9 %), 3000 V / DC (2 %), 0 V / N/A (0 %)
Structures: 4.5 km in tunnels (0.8 %), 9.9 km on bridges (1.8 %), 57 km on embankments (10.4 %), 2.8 km in cuttings (0.5 %), 476.2 km on ground level (86.5 %)
Gaps in Route:
0