Railway Operators: Infraspeed (39.4 %), ProRail (18.8 %), Infrabel (8.5 %), N/A (33.3 %)
Railway Users: passenger traffic (28.3 %), mixed traffic (6.6 %), N/A (65.1 %)
Electrification: 25000 V / 50 Hz AC (48.2 %), 3000 V / DC (26.7 %), 1500 V / DC (23.8 %), 0 V / DC (1.3 %)
Structures: 37 km in tunnels (16.4 %), 21.3 km on bridges (9.4 %), 4.6 km on embankments (2 %), 3.5 km in cuttings (1.6 %), 159.2 km on ground level (70.6 %)
Gaps in Route:
0