Railway Operators: HS1 Ltd (41.3 %), Network Rail (37.3 %), CTRL (1.6 %), N/A (19.8 %)
Railway Users: passenger traffic (41.9 %), N/A (58.1 %)
Electrification: 750 V / DC (54.9 %), 25000 V / 50 Hz AC (44.1 %), 25000 V / 750 Hz AC (1 %), electrified with unknown voltage (0 %)
Structures: 26.1 km in tunnels (31.9 %), 4.6 km on bridges (5.7 %), 1.4 km on embankments (1.7 %), 2.4 km in cuttings (2.9 %), 47.3 km on ground level (57.8 %)
Gaps in Route:
0