Route Details:

Operator: Abellio Rail Baden-Württemberg GmbH
Train Type: Regional Train
Route Length: 101.3 km
Travel Time: 64 min
Average Speed: 95 km/h
Maximum Speed: 140 km/h

Speed Profile:

Please note: Only the maximum speed of the rails are used for speed calculations. Because of signalling, individual maxspeed for different rolling stocks, tilting technology and economic reasons the actually driven speed can be different. Time needed for boarding is also not evaluated.

Railway Details:

Railway Operators: DB Netz AG (96.6 %), DB Netz (3.4 %)
Railway Users: mixed traffic (87.3 %), passenger traffic (8.7 %), N/A (4.1 %)
Electrification: 15000 V / 16.7 Hz AC (100 %)
Structures: 1.4 km in tunnels (1.4 %), 2.2 km on bridges (2.2 %), 1 km on embankments (1 %), 0.6 km in cuttings (0.6 %), 96.1 km on ground level (94.8 %)
Gaps in Route: 0

Map of Route and Stops:

Train Details:

Train Image
Train Name: DB Baureihe 146 mit 5 Doppelstockwagen
Train Type: Regional Train
Maximum Speed: 160 km/h
Weight empty: 357 t
Power: 4200 kW
Maximum Torque: 300 Nm
Maximum Brake Acceleration: 0.9 m/s²
Length: 154 m
Seats: 206