Route Details:

Operator: ÖBB-Personenverkehr AG
Train Type: Highspeed Train
Route Length: 784.9 km
Travel Time: 324 min
Average Speed: 145 km/h
Maximum Speed: 250 km/h

Speed Profile:

Please note: Only the maximum speed of the rails are used for speed calculations. Because of signalling, individual maxspeed for different rolling stocks, tilting technology and economic reasons the actually driven speed can be different. Time needed for boarding is also not evaluated.

Railway Details:

Railway Operators: ÖBB-Infrastruktur AG (72 %), SBB (13.7 %), DB Netz AG (10.6 %), DB Netz (3.7 %)
Railway Users: mixed traffic (86.2 %), N/A (13.8 %)
Electrification: 15000 V / 16.7 Hz AC (100 %)
Structures: 125 km in tunnels (15.9 %), 18.7 km on bridges (2.4 %), 14 km on embankments (1.8 %), 5.6 km in cuttings (0.7 %), 621.7 km on ground level (79.2 %)
Gaps in Route: 0

Map of Route and Stops:

Train Details:

Train Image
Train Name: Generic High Speed Train
Train Type: Highspeed Train
Maximum Speed: 320 km/h
Weight empty: 850 t
Power: 16000 kW
Maximum Torque: 400 Nm
Maximum Brake Acceleration: 0.7 m/s²
Length: 400 m
Seats: 900