Railway Operators: Infraspeed (66.6 %), ProRail (33.4 %)
Railway Users: passenger traffic (56.7 %), mixed traffic (11.3 %), N/A (32 %)
Electrification: 25000 V / 50 Hz AC (56 %), 1500 V / DC (42.1 %), 0 V / DC (1.9 %)
Structures: 22.8 km in tunnels (19.8 %), 15.6 km on bridges (13.5 %), 1.7 km on embankments (1.4 %), 3.5 km in cuttings (3 %), 71.8 km on ground level (62.2 %)
Gaps in Route:
0