Route Details:

Operator: LOSSAN Rail Corridor Agency
Train Type: Unspecified Train
Route Length: 562 km
Travel Time: 325 min
Average Speed: 104 km/h
Maximum Speed: 145 km/h

Speed Profile:

Please note: Only the maximum speed of the rails are used for speed calculations. Because of signalling, individual maxspeed for different rolling stocks, tilting technology and economic reasons the actually driven speed can be different. Time needed for boarding is also not evaluated.

Railway Details:

Railway Operators: Union Pacific Railroad (42.2 %), North County Transit District;BNSF (13.1 %), Southern California Regional Rail Authority;Union Pacific Railroad (12.5 %), Southern California Regional Rail Authority;BNSF (12 %), Union Pacific Railroad;Amtrak (6.9 %), BNSF (5.7 %), Southern California Regional Rail Authority (2.3 %), North San Diego County Transit District (2.2 %), North San Diego County Transit District;BNSF (1.7 %), Southern California Regional Rail Authority;Union Pacific Railroad;LOSSAN Rail Corridor Agency (0.1 %), North County Transit DistricT (0.1 %), N/A (1.2 %)
Railway Users: N/A (100 %)
Electrification: not electrified (72.9 %), N/A (27.1 %)
Structures: 2.8 km in tunnels (0.5 %), 12.3 km on bridges (2.2 %), 1.1 km on embankments (0.2 %), 545.9 km on ground level (97.1 %)
Gaps in Route: 4 (Analyze route)

Map of Route and Stops:

Train Details:

Train Image
Train Name: DB Baureihe 146 mit 5 Doppelstockwagen
Train Type: Regional Train
Maximum Speed: 160 km/h
Weight empty: 357 t
Power: 4200 kW
Maximum Torque: 300 Nm
Maximum Brake Acceleration: 0.9 m/s²
Length: 154 m
Seats: 206