Railway Operators: WLB (81 %), Wiener Linien (18.2 %), WL (0.4 %), N/A (0.3 %)
Railway Users: mixed traffic (60.3 %), passenger traffic (39.7 %)
Electrification: 850 V / DC (67.3 %), 600 V / DC (18.6 %), 750 V / DC (14 %)
Structures: 1.9 km in tunnels (6.2 %), 0.2 km on bridges (0.5 %), 0.2 km in cuttings (0.5 %), 27.9 km on ground level (92.7 %)
Gaps in Route:
0