Railway Operators: Network Rail (42.6 %), London Overground (4.4 %), N/A (53.1 %)
Railway Users: mixed traffic (12.8 %), freight traffic (0.3 %), N/A (86.9 %)
Electrification: 25000 V / 50 Hz AC (78.2 %), 750 V / DC (20.8 %), 25000/750 V / 50/0 Hz AC (0.9 %)
Structures: 1.8 km in tunnels (6.3 %), 3.6 km on bridges (13 %), 5.3 km on embankments (18.9 %), 3.1 km in cuttings (11 %), 14.3 km on ground level (50.8 %)
Gaps in Route:
0