Route Details:

Operator: DB Regio AG/S-Bahn München
Train Type: Commuter Train
Route Length: 65.2 km
Travel Time: 52 min
Average Speed: 75 km/h
Maximum Speed: 100 km/h
Known speed limits in OSM database: 95.4 %

Speed Profile:

Download CSV File
Please note: Only the maximum speed of the rails are used for speed calculations. Because of signalling, individual maxspeed for different rolling stocks, tilting technology and economic reasons the actually driven speed can be different. Time needed for boarding is also not evaluated.

Railway Details:

Railway Operators: DB Netz AG (98.9 %), N/A (1.1 %)
Railway Users: passenger traffic (0.9 %), N/A (99.1 %)
Electrification: 15000 V / 16.7 Hz AC (100 %)
Structures: 4.5 km in tunnels (6.8 %), 2.3 km on bridges (3.5 %), 58.5 km on ground level (89.7 %)
Gaps in Route: 0
Array ( [0] => 0 ) Array ( [0] => 0 )
Position Image Location Description Distance to main signal Distance between main signals Show on map
km 6.66 German H/V Distant Signal
Speed in area behind signal: 70
748 m x Show on map
4061584025
km 7.4 1F German H/V Entry Signal
German H/V Distant Signal
Speed in area behind signal: 70
679 m 679 m Show on map
9506052814
km 8.08 1P1 German H/V Exit Signal
Speed in area behind signal: 70
x 1152 m Show on map
1717863981
km 8.68 German H/V Repeated Distant Signal
Speed in area behind signal: 70
554 m x Show on map
9509250829
km 9.24 German H/V Entry Signal
Speed in area behind signal: 70
x 12374 m Show on map
9509250830
km 21.36 German H/V Repeated Distant Signal
Speed in area behind signal: 100
245 m x Show on map
9655722781
km 21.61 P120 German H/V Exit Signal
with Speed Signal (120)
German H/V Distant Signal
Speed in area behind signal: 100
? 7925 m Show on map
374499450
km 29.53 42
P4
German Ks Entry Signal
combined with German Ks Distant Signal
with German Zs3v Distant Speed Signal (60, off, ?)
Speed in area behind signal: 60
853 m 853 m Show on map
309124944
km 30.39 43
P1
German Ks Entry Signal
combined with German Ks Distant Signal
Speed in area behind signal: 60
578 m 578 m Show on map
4293749071
km 30.96 German Ks Main Signal
combined with German Ks Distant Signal
Speed in area behind signal: 60
x 4880 m Show on map
4293749070
km 35.84 German H/V Main Signal
German H/V Distant Signal
Speed in area behind signal: 90
679 m 679 m Show on map
7471715361
km 36.52 705 German H/V Main Signal
with German Zs3 Speed Signal (60)
German H/V Distant Signal
Speed in area behind signal: 100
847 m 847 m Show on map
8833523348
km 37.37 R403 German H/V Exit Signal
German H/V Distant Signal
Speed in area behind signal: 100
963 m 963 m Show on map
9108786631
km 38.12 German H/V Distant Signal
with German Zs3v Distant Speed Signal (off)
Speed in area behind signal: 80
214 m x Show on map
7455154106
km 38.33 N483 German H/V Main Signal
with German Zs3 Speed Signal (off)
German H/V Distant Signal
Speed in area behind signal: 100
458 m 458 m Show on map
7455154109
km 38.79 German H/V Main Signal
with German Zs3 Speed Signal (off)
Speed in area behind signal: 80
x 1425 m Show on map
7455154117
km 39.21 German H/V Distant Signal
Speed in area behind signal: 80
1000 m x Show on map
4540386796
km 40.22 German H/V Main Signal
German H/V Distant Signal
Speed in area behind signal: 100
1030 m 1030 m Show on map
4540386793
km 41.25 1N2 German H/V Main Signal
Speed in area behind signal: 100
x 2253 m Show on map
4540379682
km 42.52 German H/V Distant Signal
Speed in area behind signal: 100
975 m x Show on map
4621386816
km 43.5 2A German H/V Entry Signal
with German Zs3 Speed Signal (60)
German H/V Distant Signal
Speed in area behind signal: 100
516 m 516 m Show on map
4621386812
km 44.01 2P2 German H/V Exit Signal
Speed in area behind signal: 100
x 229 m Show on map
494233360
km 44.24 2N2 German H/V Exit Signal
Speed in area behind signal: 100
x 3531 m Show on map
4193614732
km 46.75 German H/V Distant Signal
Speed in area behind signal: 100
1020 m x Show on map
4512598659
km 47.77 German H/V Entry Signal
with German Zs3 Speed Signal (60)
German H/V Distant Signal
Speed in area behind signal: 100
828 m 828 m Show on map
7352553894
km 48.6 3N1 German H/V Exit Signal
Speed in area behind signal: 100
x 2773 m Show on map
7352553889
km 50.38 German H/V Distant Signal
Speed in area behind signal: 80
990 m x Show on map
7352539076
km 51.37 4A German H/V Entry Signal
with German Zs3 Speed Signal (60)
German H/V Repeated Distant Signal
Speed in area behind signal: 80
764 m 764 m Show on map
4925243139
km 52.14 4N2 German H/V Exit Signal
with Speed Signal (100)
Speed in area behind signal: 100
x 6037 m Show on map
4925243147
km 58.18 5A German H/V Main Signal
German H/V Distant Signal
Speed in area behind signal: 100
800 m 800 m Show on map
4913551511
km 58.98 5N2 German H/V Exit Signal
Speed in area behind signal: 90
x 5775 m Show on map
4917566398
km 64.46 German H/V Repeated Distant Signal
Speed in area behind signal: 100
287 m x Show on map
4862703886
km 64.75 G German H/V Entry Signal
German H/V Distant Signal
Speed in area behind signal: 100
? ? Show on map
4862703887
33 signals found on this route.

Map of Route and Stops:

Train Details:

Train Image
Train Name: Generic Light Rail Train
Train Type: Light Rail
Maximum Speed: 100 km/h
Weight empty: 60 t
Power: 600 kW
Maximum Torque: 50 Nm
Maximum Brake Acceleration: 1.6 m/s²
Length: 40 m
Seats: 100