Route Details:

Operator: 한국철도공사
Train Type: Highspeed Train
Route Length: 416.8 km
Travel Time: 1 h 36 min
Average Speed: 261 km/h
Maximum Speed: 305 km/h
Known speed limits in OSM database: 86.2 %

Speed Profile:

Download CSV File
Please note: Only the maximum speed of the rails are used for speed calculations. Because of signalling, individual maxspeed for different rolling stocks, tilting technology and economic reasons the actually driven speed can be different. Time needed for boarding is also not evaluated.

Railway Details:

Railway Operators: 한국철도공사 (Korail) (27.7 %), 한국철도공사 (18.3 %), 한국철도공 (1.2 %), N/A (52.7 %)
Railway Users: passenger traffic (31.2 %), N/A (68.8 %)
Electrification: 25000 V / 60 Hz AC (100 %), N/A (0 %)
Structures: 170.8 km in tunnels (41 %), 114.8 km on bridges (27.5 %), 7.8 km on embankments (1.9 %), 123.5 km on ground level (29.6 %)
Gaps in Route: 4 (Analyze route)
Position Image Location Description Distance to main signal Distance between main signals Show on map
No signals found for this route.
0 signals found on this route.

Map of Route and Stops:

Train Details:

Train Image
Train Name: DB ICE 3 Velaro
Train Type: Highspeed Train
Maximum Speed: 320 km/h
Weight empty: 454 t
Power: 8000 kW
Maximum Torque: 300 Nm
Maximum Brake Acceleration: 0.7 m/s²
Length: 201 m
Seats: 460