Route Details:

Operator: DB Fernverkehr
Train Type: Highspeed Train
Route Length: 545.3 km
Travel Time: 3 h 23 min
Average Speed: 161 km/h
Maximum Speed: 230 km/h
Known speed limits in OSM database: 99 %

Speed Profile:

Download CSV File
Please note: Only the maximum speed of the rails are used for speed calculations. Because of signalling, individual maxspeed for different rolling stocks, tilting technology and economic reasons the actually driven speed can be different. Time needed for boarding is also not evaluated.

Railway Details:

Railway Operators: DB Netz AG (77.3 %), DB Netz (14.1 %), N/A (8.6 %)
Railway Users: mixed traffic (46.4 %), passenger traffic (24.7 %), N/A (28.9 %)
Electrification: 15000 V / 16.7 Hz AC (100 %)
Structures: 25.1 km in tunnels (4.6 %), 24.8 km on bridges (4.5 %), 21.8 km on embankments (4 %), 13.6 km in cuttings (2.5 %), 460 km on ground level (84.4 %)
Gaps in Route: 0