Route Details:

Operator: Nederlandse Spoorwegen
Train Type: Long Distance Train
Route Length: 69.7 km
Travel Time: 44 min
Average Speed: 96 km/h
Maximum Speed: 100 km/h
Known speed limits in OSM database: 100 %

Speed Profile:

Download CSV File
Please note: Only the maximum speed of the rails are used for speed calculations. Because of signalling, individual maxspeed for different rolling stocks, tilting technology and economic reasons the actually driven speed can be different. Time needed for boarding is also not evaluated.

Railway Details:

Railway Operators: Infraspeed (67 %), ProRail (33 %)
Railway Users: passenger traffic (93.6 %), N/A (6.4 %)
Electrification: 25000 V / 50 Hz AC (60.7 %), 1500 V / DC (38.3 %), 0 V / DC (1 %)
Structures: 15.2 km in tunnels (21.8 %), 12.8 km on bridges (18.4 %), 1.7 km on embankments (2.4 %), 1.9 km in cuttings (2.7 %), 38.2 km on ground level (54.8 %)
Gaps in Route: 0
Position Image Location Description Distance to main signal Distance between main signals Show on map
km 0.32 25
06
Unknown Main Signal
Speed in area behind signal: 40
x 383 m Show on map
6360833342
km 0.71 606 Unknown Main Signal
Speed in area behind signal: 60
x 571 m Show on map
6360833388
km 1.28 494 Unknown Main Signal
Speed in area behind signal: 80
x 1294 m Show on map
6360833408
km 2.57 436 Unknown Main Signal
Speed in area behind signal: 80
x 1265 m Show on map
6360833458
km 3.83 18
03
Unknown Main Signal
Speed in area behind signal: 80
x 965 m Show on map
6360833347
km 4.8 18
07
Unknown Main Signal
Speed in area behind signal: 80
x 903 m Show on map
6360832131
km 5.7 18
11
Unknown Main Signal
Speed in area behind signal: 80
x 566 m Show on map
6360833354
km 6.27 910 Unknown Main Signal
Speed in area behind signal: 100
x 423 m Show on map
6360832935
km 6.69 934 Unknown Main Signal
Speed in area behind signal: 100
x 1026 m Show on map
6360832936
km 7.72 18
23
Unknown Main Signal
Speed in area behind signal: 100
x 1198 m Show on map
6360833093
km 8.92 954 Unknown Main Signal
Speed in area behind signal: 100
x 985 m Show on map
6360833107
km 9.9 18
29
Unknown Main Signal
Speed in area behind signal: 80
x 942 m Show on map
6360832960
km 10.84 10
12
Unknown Main Signal
Speed in area behind signal: 80
x 1286 m Show on map
6359304675
km 12.13 17
07
Unknown Main Signal
Speed in area behind signal: 100
x 1298 m Show on map
6358041411
km 13.43 17
21
Unknown Main Signal
Speed in area behind signal: 100
x 1458 m Show on map
6358041174
km 14.89 17
35
Unknown Main Signal
Speed in area behind signal: 100
x 1153 m Show on map
6358041386
km 16.04 10
46
Unknown Main Signal
Speed in area behind signal: 100
x 430 m Show on map
6358041394
km 16.47 10
38
Unknown Main Signal
Speed in area behind signal: 80
x 742 m Show on map
6358041153
km 17.21 10
80
Unknown Main Signal
Speed in area behind signal: 80
x 427 m Show on map
6358041102
km 17.64 10
98
Unknown Main Signal
Speed in area behind signal: 100
x 569 m Show on map
6358041114
km 18.21 17
57
Unknown Main Signal
Speed in area behind signal: 100
x 1195 m Show on map
6358041122
km 19.4 17
71
Unknown Main Signal
Speed in area behind signal: 100
x 1157 m Show on map
6358040884
km 20.56 11
06
Unknown Main Signal
Speed in area behind signal: 100
x 1252 m Show on map
6358041095
km 21.81 11
32
Unknown Main Signal
Speed in area behind signal: 100
x ? Show on map
6358040871
24 signals found on this route.

Map of Route and Stops:

Train Details:

Train Image
Train Name: AVG Stadtbahn ET2010
Train Type: Light Rail
Maximum Speed: 100 km/h
Weight empty: 62 t
Power: 600 kW
Maximum Torque: 74 Nm
Maximum Brake Acceleration: 1.5 m/s²
Length: 37 m
Seats: 95