-1450.1933001636|95|95 Train Analysis: TGV 750 Genève → Lyon → Nice

Route Details:

Operator: SNCF
Train Type: Unspecified Train
Route Length: 1467 km
Travel Time: 638 min
Average Speed: 138 km/h
Maximum Speed: 160 km/h

Speed Profile:

0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
0
50
100
150
200
Please note: Only the maximum speed of the rails are used for speed calculations. Because of signalling, individual maxspeed for different rolling stocks, tilting technology and economic reasons the actually driven speed can be different. Time needed for boarding is also not evaluated.

Railway Details:

Railway Operators: SNCF Réseau (97.9 %), SBB (2.1 %)
Railway Users: mixed traffic (56.9 %), passenger traffic (40.8 %), N/A (2.2 %)
Electrification: 25000 V / 50 Hz AC (76.9 %), 1500 V / DC (22.9 %), 25000 V / 15000 Hz AC (0.3 %)
Structures: 74.7 km in tunnels (5.1 %), 74.8 km on bridges (5.1 %), 39.5 km on embankments (2.7 %), 14.6 km in cuttings (1 %), 1263.5 km on ground level (86.1 %)
Gaps in Route: 374 (Analyze route)

Map of Route and Stops:

Train Details:

Train Image
Train Name: Generic Regional Train
Train Type: Regional Train
Maximum Speed: 160 km/h
Weight empty: 110 t
Power: 2400 kW
Maximum Torque: 150 Nm
Maximum Brake Acceleration: 0.9 m/s²
Length: 100 m
Seats: 200