Route Details:

Operator: DSB Øresund;Transdev
Train Type: Regional Train
Route Length: 385 km
Travel Time: 145 min
Average Speed: 159 km/h
Maximum Speed: 200 km/h

Speed Profile:

Please note: Only the maximum speed of the rails are used for speed calculations. Because of signalling, individual maxspeed for different rolling stocks, tilting technology and economic reasons the actually driven speed can be different. Time needed for boarding is also not evaluated.

Railway Details:

Railway Operators: Banedanmark (12.2 %), Øresundsbro Konsoriet (7.4 %), N/A (80.4 %)
Railway Users: mixed traffic (66.1 %), passenger traffic (15.9 %), N/A (18 %)
Electrification: 15000 V / 16.67 Hz AC (79 %), 25000 V / 50 Hz AC (19.6 %), 15000 V / N/A (0.5 %), electrified with unknown voltage (0.1 %), 0 V / DC (0 %), N/A (0.8 %)
Structures: 36 km in tunnels (9.4 %), 15.8 km on bridges (4.1 %), 0.7 km in cuttings (0.2 %), 332.5 km on ground level (86.4 %)
Gaps in Route: 4 (Analyze route)

Map of Route and Stops:

Train Details:

Train Image
Train Name: SNCF TGV Duplex
Train Type: Highspeed Train
Maximum Speed: 320 km/h
Weight empty: 380 t
Power: 8800 kW
Maximum Torque: 410 Nm
Maximum Brake Acceleration: 0.7 m/s²
Length: 200 m
Seats: 508