Route Details:

Operator: DB
Train Type: Unspecified Train
Route Length: 313.6 km
Travel Time: 147 min
Average Speed: 128 km/h
Maximum Speed: 140 km/h

Speed Profile:

Please note: Only the maximum speed of the rails are used for speed calculations. Because of signalling, individual maxspeed for different rolling stocks, tilting technology and economic reasons the actually driven speed can be different. Time needed for boarding is also not evaluated.

Railway Details:

Railway Operators: DB Netz (97.8 %), SBB;DB Netz AG (1.4 %), DB Netz AG (0.7 %), N/A (0 %)
Railway Users: mixed traffic (27.1 %), N/A (72.9 %)
Electrification: not electrified (67.9 %), 15000 V / 16.7 Hz AC (32.1 %)
Structures: 4.8 km in tunnels (1.5 %), 4.7 km on bridges (1.5 %), 6.4 km on embankments (2.1 %), 0.7 km in cuttings (0.2 %), 297 km on ground level (94.7 %)
Gaps in Route: 5 (Analyze route)

Map of Route and Stops:

Train Details:

Train Image
Train Name: DB Baureihe 425
Train Type: Regional Train
Maximum Speed: 140 km/h
Weight empty: 114 t
Power: 2350 kW
Maximum Torque: 150 Nm
Maximum Brake Acceleration: 0.9 m/s²
Length: 68 m
Seats: 206