Route Details:

Operator: DVB
Train Type: Tram
Route Length: 14.9 km
Travel Time: 24 min
Average Speed: 37 km/h
Maximum Speed: 50 km/h

Speed Profile:

Please note: Only the maximum speed of the rails are used for speed calculations. Because of signalling, individual maxspeed for different rolling stocks, tilting technology and economic reasons the actually driven speed can be different. Time needed for boarding is also not evaluated.

Railway Details:

Railway Operators: DVB (98.2 %), Dresdner Verkehrsbetriebe AG (1.8 %)
Railway Users: passenger traffic (98.2 %), mixed traffic (1.8 %)
Electrification: 600 V / DC (100 %)
Structures: 0 km on bridges (0.3 %), 14.9 km on ground level (99.7 %)
Gaps in Route: 0

Map of Route and Stops:

Train Details:

Train Image
Train Name: SNCF TGV Duplex
Train Type: Highspeed Train
Maximum Speed: 320 km/h
Weight empty: 380 t
Power: 8800 kW
Maximum Torque: 410 Nm
Maximum Brake Acceleration: 0.7 m/s²
Length: 200 m
Seats: 508